• With the increase in the load limit for winter road, materials for the 3NE solar farm are shipped into the Fort Chipewyan community
  • Ten truckloads of solar panels, ten truckloads of racking and screw piles for the foundations and two control buildings that will house the inverters and electronics for the farm are transported on the winter road
  • ATCO is also bringing in their own materials for the batteries and controls for their plants which will allow them to receive power; this power will be incorporated into the electrical grid.